- Construction Projects[10]
- Metal Building Materials[10]
- Other Plastic Building Materials[1]
- Office Buildings[10]
- Other Real Estate[3]
- Prefab Houses[10]
- Villas[10]
- Warehouses[10]
- Workshops & Plants[10]
- Fencing[1]
- Steel Sheets[1]
- Steel Structures[10]
- Traffic Barrier[6]
- Telecommunication Tower[2]
pre-engineered steel house
1.pre-engineered steel house ,steel mobile house ,light steel prefab house
2.easily assemble
3.antiearthquake ,comfortable
products name:pre-engineered steel house ,steel mobile house ,light steel prefab house
1.good apperance , high quality
2.long life span, ISO , CE
3.easily assemble
4.antiearthquake ,comfortable
Life span: more than 70years
High seismic performance-----maximum protection more than 8 scales
Wind-proof----- can safety face maximum typhoon of 70 meters per second
Fire resistance-----duration about 4 hours depends on different design.
Snow resistance-----a maximum snow load of 2.9KN/M2 as required
High water and heat insulation----100 mm in thickness can match that of brick wall more than 1m thickness.
High acoustic insulation----- 60db of exterior wall 40db of interior wall
insect prevention: free from the damages by the inspects, such as white ants, and so on
Ventilation-----a combination of natural ventilation & air supply keep the indoor air fresh and clean
layout:
(1) Steel Structure
galvanized steel frames: 0.8-2mm thickness light steel gauge
(2) Flooring
A. Prefabricated Deck panels+ light mixed cement+ steel bar
or
B. light steel gauge frame +OSB board
(3) Foundation connection
Reinforced concrete + Standard embedded anchor bolts
whole or strip are all ok
(4) Windows and Doors
Windows: Double glazing plastic-steel or aluminum alloy thermo-insulating frames
Doors: steel security gate doors; wood or molded doors
(5) Composite Wall System (thickness:150-250mm)
Plaster board + steel framces + glass wool + OSB board + anti-moisture foil + foam insulation board + facing decorations
----Facing decorations materials:
A. Cement light mixed board(magnesium oxide and magnesium chloride)
B. Metal embossing composite insulation panel
C. PVC wall panel
D. Stucco
E. Artificial stone
F. Paint
(6) Roofing System
roofing tile + SBS waterproof sheet + Cement light mixed board+ roof joist + rainspout
----roofing tiles
1. Asphalt tile
2. Cement tile
3. Clay tile
4. Color steel tile
5. Glass fiber tile
Packing and delivery:one 40’HQ container can load all the materials for about 200 square meters
Installation: it takes 10 workers 30-45 days to install a villa for 250 square meters.
Project cases: Australia,Kazakhstan,Mongolia,Ukraine,Middle East,Chile,Sudan, England, ect.